A wedge or gasket dispensing device is provided between the two rollers of the roller crusher. The top of the wedge is equipped with an adjusting bolt. When the adjusting bolt pulls up the wedge, the wedge moves the movable roller from the fixed wheel, That is, the two rollers become larger and larger, the material size becomes larger, when the wedge down, the activities of the roller in the spring under the effect of two small open space, the material size becomes smaller. The gasket is the size or thickness of the gasket to dispatch the size of the material, and when the gasket is increased, the two rollers become larger and larger, and when the gasket is reduced, the two rollers become smaller and the particle size becomes smaller The use of roller crusher:Pay attention to iron operations for mineral processing, chemical, cement, building materials and other industrial sectors in the crushing and crushing all kinds of moderate hardness of the following minerals and rocks. Mainly by the body, the roller and the safety of some of the composition of the spring. The drive is driven by the motor by the triangular belt to move the two rollers to do the relative direction of rotation, ending the material broken. The roller distance can be scheduled within the specified range to control the size of the material size.

Please pay special attention to the following when handling the roller crusher:

1. When dealing with materials containing large pieces, pay attention to large pieces of ore from the crushing space to squeeze out to prevent wounding or damage to equipment.
2. For a long time after the roller crusher, because the roller surface wear, will cause the product size is too small, then pay attention to adjust the discharge port or on the roller crusher repair.
3. To strengthen the inspection of the roller crusher, the roller crusher lubrication parts to refuel on time to ensure that the roller crusher lubrication.
4. Pay attention to iron removal operations. Non-crushed material falling into the roll will damage the roller crusher, resulting in a downtime. So before the work of the roller crusher should pay attention to iron removal operations.
5. Sticky material simply plug the broken space, in dealing with plugging problems should be shut down, can not be carried out in the work.